Save this content for laterSave this content on your device for later, even while offline Sign in with FacebookSign in with your Facebook account Close

Milwaukee Art Museum plans expansion

By: CARRIE ANTLFINGER
April 10, 2014 Updated: April 10, 2014 at 1:32 pm
0

MILWAUKEE (AP) — The Milwaukee Art Museum, known for its bold expansion designed by Spanish architect Santiago Calatrava 13 years ago, is planning another expansion along Lake Michigan.

When finished, the $25 million project will give the museum 17,000 square feet more space and renovate two of its older buildings, including the War Memorial Center designed by modernist architect Eero Saarinen, whose works include the Gateway Arch in St. Louis.

Milwaukee architect Jim Shields, of HGA Architects and Engineers, came up with something respectful and mindful of both Saarinen's and Calatrava's designs, said Dan Keegan, director of the Milwaukee Art Museum.

"We realized the goal here in the design of this building is not to try to compete with (the Saarinen building) and similarly the goal of this addition was not to try to replicate what is going (with the Calatrava designed building)," Keegan said.

The addition will be light colored and glassy, like the Calatrava building with its glass ceiling and moveable sunscreen, which opened in 2001 as Calatrava's first completed project in the United States. The addition will also have a cantilevered aspect, like Saarinen's building.

The extra space allows more of its 30,000 works to be on view, Keegan said. Currently, only 2,000 to 3,000 pieces can be viewed at any given time in its 345,000 square feet. The addition will also allow visitors to make a circular path around the permanent collection for the first time and allow a lakeside entrance.

Construction is expected to start this fall and the art in the two buildings will be put in storage until work is done in fall of 2015. The Calatrava addition, called the Quadracci Pavilion, will remain open.

The county owns the War Memorial Center, finished in 1957, and the Kahler Building from 1975, which both house the museum's permanent collection. They are chipping in $10 million to repair mold, a leaky roof, mold issues, broken concrete, leaking windows and foundation problems in the two buildings.

The museum is responsible for the $15 million, with $13 million already in the bank. Fundraising started two years ago, well after the recession ended, Keegan said.

Before the recession, there used to be a sense the money would never dry up, Keegan said, but now they have to be cautiously optimistic on such a project. He said they could have used even more space but decided it wasn't feasible.

"There is a more thorough vetting of what makes sense to make sure it's the right measure and the right proportion and it's not just an irrational exuberance around let's just build, build, build," he said.

Donors have always been cautious but now they are asking even more questions, he said.

"I think donors these days want to make sure their contributions are for generations and they want to make sure the change and improvements we are making are sustainable," he said.

Comment Policy
Register to the Colorado Springs Gazette
Register to the Colorado Springs Gazette
Subscribe to the Colorado Springs Gazette

It appears that you value local journalism. Thank you.

Subscribe today for unlimited digital access with 50% fewer ads for a faster browsing experience.

Already a Subscriber? LOGIN HERE

Subscribe to the Colorado Springs Gazette

It appears that you value local journalism. Thank you.

Subscribe today for unlimited digital access with 50% fewer ads for a faster browsing experience.

Subscribe to the Colorado Springs Gazette

Some news is free.
Exceptional journalism takes time, effort and your support.

Already a Subscriber? LOGIN HERE

articles remaining
×
Thank you for your interest in local journalism.
Gain unlimited access, 50% fewer ads and a faster browsing experience.