FAA approves Boeing plan to fix 787’s batteries

Modified: March 12, 2013 at 12:00 am • Published: March 12, 2013

WASHINGTON — Federal regulators have approved a Boeing plan to redesign the 787 Dreamliner’s fire-prone lithium-ion batteries, although extensive testing will be needed before the planes can fly passengers again.

The Federal Aviation Administration said Tuesday the plan includes a redesign of the internal battery components to minimize the possibility of short-circuiting, better insulation of the battery’s eight cells and the addition of a new containment and venting system.

The FAA says the battery certification plan requires a series of tests, including flight tests, which must be passed before the 787 can return to service.

The 787 fleet worldwide has been grounded since Jan. 16, following a battery fire on a Dreamliner parked in Boston and a smoking battery that led to emergency landing by other another 787 in Japan

Colorado Springs Gazette has disabled the comments for this article.
Advertisement

Advertisement

Advertisement

Advertisement

MAY
23
MAY
24
MAY
25
MAY
26
MAY
27
MAY
28
MAY
29
MAY
30
MAY
31
JUN
1
JUN
2
JUN
3
JUN
4
JUN
5